As the city of Aurora improves its infrastructure offerings to its current and future residents, demands for more infrastructure, improvements and repairs also grow. On any given work day, there can be as many as 100 active work zones within the city.
Traffic engineering staff make every effort to minimize the impact of these work zones to the traveling public. In addition to reviewing and approving the plans to ensure they are safe and compliant with all regulations, staff also work with contractors to seek alternatives to street closures and minimize the number of lane closures and their duration. Staff also try to keep conflicting work zones from overlapping in time or space. In most cases, these efforts are successful. However, on occasion, alternatives are not available and since we are dealing with the outdoor environment, even the best planned projects get delayed by weather, special events or unknown conditions, resulting in confusion and/or unplanned congestion.
Sign up now for weekly construction updates delivered directly to your inbox via Road Construction Roundup.
Interactive map available
The city has an online map that shows work happening throughout the city that may impact travel on roadways. The map captures annual street maintenance work, transportation projects, public and private utility work, and development projects impacting roadways. Visit this link to view the map.
Annual Street Maintenance Work
See the Weekly Roadwork Construction Schedule
Visit this link for more information about city of Aurora roadwork.
Other Road Construction Work (weather delays may be expected for all work zones)
Please note: Although the city informs online mapping services about our road closures and designated detours/alternate routes, the routes they provide to the general traveling public are generally the shortest or quickest routes between two points. That results in drivers sometimes not following the city's designated detour/alternate routes.
In-progress and due-to-start Projects
26th Avenue lane closures
Both directions of 26th Avenue between Powhaton and Monaghan roads will have alternating lanes closed from 7 a.m. to 5 p.m. weekdays only through Dec. 4 due to a private utility working to install new infrastructure.
64fh Avenue lane closure
Westbound 64th Avenue approaching Gun Club Road will have one lane closed to through traffic from 8:30 a.m. to 3:30 p.m. weekdays only from Nov. 16 to Feb. 5 due to a public project to install new infrastructure.
Chambers lane closure (south of Hampden)
Southbound Chambers Road south of Hampden Avenue will have one lane closed to through traffic around the clock through Dec. 25 due to a city project to replace infrastructure.
Chambers lane closures (near Smoky Hill)
Southbound Chambers Road approaching Smoky Hill Road will have two lanes closed from 8:30 a.m. to 3:30 p.m. weekdays through Dec. 11 due to a private utility making emergency repairs.
Colfax lane closure (west of Laredo)
Westbound Colfax Avenue west of Laredo Street will have one lane closed to through traffic from 8:30 a.m. to 3:30 p.m. weekdays through Dec. 4 due to a city project to improve sidewalks.
Colfax BRT Project (traffic impacts due to the installation of new infrastructure related to the East Colfax Bus Rapid Transit Project)
-Westbound Colfax between Yosemite and I-225: Intermittent lane closures from 8:30 a.m. to 3:30 p.m. weekdays through Dec. 31
-Both directions of Colfax at Peoria: Two lanes closed around the clock on eastbound Colfax Avenue and one lane closed around the clock on westbound Colfax Avenue through Nov. 24
-Westbound Colfax approaching Moline: One lane closed around the clock through Dec. 11
-
Eastbound Colfax between Yosemite and Akron: One lane closed around the clock through Nov. 20
-
Both directions of Colfax at Chester: One lane closed around the clock through Nov. 30
-Westbound Colfax between Moline and Lansing: Intermittent lanes closed around the clock from Nov. 16 to 25
Denali full closure
Both directions of Denali Boulevard between 47th and 49th avenues will have a full closure around the clock through Nov. 16 due to a private developer working to install new infrastructure.
Gartrell lane shift
Both directions of Gartrell Road between Aurora Parkway and East Dry Creek Road will have one lane shifted left around the clock through July 27, 2027, due to a city project constructing enhanced traffic flow. Bridge beam installation will start Nov. 17. There will be a full closure of Gartrell Road over E-470 from Aurora Parkway to Dry Creek Road during evening and overnight hours only from Tuesday, Nov. 17, to Thursday, Nov. 19. Detours will be in place, using Arapahoe Road and Aurora Parkway as access routes to Gartrell Road. While this work is underway, E-470 will be closed in one direction at a time at Gartrell Road during evening and overnight hours, with a detour in place over the interchange. No exits will be available at the E-470 and Gartrell Road interchange during this work. Drivers should use Smoky Hill Road as the alternate route to access destinations normally reached via the Gartrell Road exits. Detour signage will be posted. As part of this work, tolls at the Gartrell Road interchange will be waived during the closures.
Havana full closure (Colfax to 17th)
Both directions of Havana Street between Colfax and 17th avenues will be fully closed around the clock through Dec. 4 due to a city project to make safety upgrades. The alternate route will use Del Mar Parkway between Colfax and 17th avenues.
Havana lane closures (at Mississippi)
Southbound Havana Street at Mississippi Avenue will have two lanes closed 8:30 a.m. to 3:30 p.m. Nov. 17 to 20 due to a private utility working to maintain utilities.
Hoffman lane closures
Both directions of Hoffman Boulevard between Del Mar Circle and Yuba Street will have intermittent lane closures rolling several blocks at a time around the clock through Dec. 30 due to a city project to maintain infrastructure. Use alternate route; expect slow traffic.
Iliff lane closure (between Buckley and Telluride)
Both directions of Iliff Avenue between Buckley and Telluride roads will have one lane closed from 8:30 a.m. to 3:30 p.m. weekdays through Dec. 17 due to a city project to improve medians.
Mississippi lane closures (at Havana)
Both directions of Mississippi Avenue at Havana Street will have intermittent lane closures from 8:30 a.m. to 3:30 p.m. through Nov. 20 due to a private utility working to maintain utilities.
Mississippi lane closures (between Buckley and Chambers)
Westbound Mississippi Avenue between Buckley and Chamber roads will have two lanes closed from 8:30 a.m. to 3:30 p.m. Nov. 16 to 21 due to a private utility working to maintain utilities.
Peoria intermittent lane closures (between Sixth and 11th)
Both directions of Peoria Street between Sixth and 11th avenues will have intermittent lane closures and shifts around the clock through Jan. 31 due to a city water project to maintain utilities.
Peoria lane closure (at Mississippi)
Both directions of Peoria Street south of Mississippi Avenue will have one lane closed and shifted from 8:30 a.m. to 3:30 p.m. Nov. 17 to 20 due to a private utility working to maintain utilities.
Picadilly lane closures (between 11th and Eighth)
Both directions of Picadilly Road between 11th and Eighth avenues will have lanes shifted and narrowed overnight daily through Nov. 20 due to a private developer working ton construct enhanced traffic flow. The same project will result in both directions seeing one lane closed with flaggers from 7 a.m. to 5 p.m. daily through Nov. 20.
Powhaton single-lane traffic (at 32nd)
Both directions of Powhaton Road between County Line Road and Mineral Drive will have intermittent lanes closed with flaggers from 8:30 a.m. to 3:30 p.m. weekdays only through Nov. 13 due to a city project to perform surface repairs.
Sixth Avenue lane closure (at Peoria)
Eastbound Sixth Avenue will have one lane closed at Peoria Street around the clock through Nov. 25 due to a city water project to maintain utilities.
Sixth Avenue lane closure (between Chambers and Sable)
Westbound Sixth Avenue between Chambers Avenue and Sable Boulevard will have one lane closed intermittently weekdays only from 8:30 a.m. to 3:30 p.m. Nov. 18 to Feb. 5 due to a private utility working to maintain utilities.
Parker/Quincy/Smoky Hill Intersection Improvements Project
Construction of the Parker/Quincy/Smoky Hill Intersection Improvement Project has begun and will continue through at least December 2026, with additional time built in to ensure the project is completed safely and successfully.
Construction activity will start at 7:30 a.m. and end at 5:30 p.m. Monday through Friday, with lane closures from 8:30 a.m. to 3:30 p.m.
Travel Impacts for Monday, Nov. 16, to Friday, Nov. 20 (lane closures will not occur simultaneously)
- Overnight Sunday, Nov. 15, through Monday, Nov. 16, there will be multiple closures at the Parker Road and Quincy Avenue intersection due to traffic mast arm installation from 8 p.m. to 6 a.m. Alternate routes are highly advised.
- Westbound center lane closure on Quincy Avenue from Atchison Way to Parker Road 24/7.
- Northbound right lane closure on Parker Road from Rice Place to Quincy Avenue.
- Southbound right lane closure along Parker Road from Quincy Avenue to Rice Place.
- Westbound and eastbound lane closures along the corridor on Quincy Avenue.
Current Progress:
Construction is nearing completion for this project. The majority of concrete and asphalt work is complete, including roadway paving and intersection improvements. Temporary pavement striping is currently in place to maintain traffic flow.
Remaining Work:
Visit the project webpage to view weekly travel impacts.
56th and Hudson Road Closures and Project
(view map for aerial view of closure impacts and alternate routes)
Please note: Flood damage has restricted access to both 56th Avenue and Hudson Road. Heavy rainfall undermined the roadways and destroyed the road surface in some locations. The road closures are necessary to protect the traveling public while the project team works to reopen the roadways. Project information will continue to be posted on the project webpage as it becomes available.
-56th Avenue between Monaghan and Hudson
Both directions of 56th Avenue between Monaghan and Hudson roads are fully closed around the clock due to extensive road damage. The replacement road is currently being designed, and construction is now estimated to start in summer 2027. Follow the signed detour; use alternate routes. The detour route uses Monaghan Road or Imboden Road between 26th Avenue and 56th Avenue.
-Hudson Road between 56th Avenue and 26th Avenue
Both directions of Hudson Road between 56th and 26th avenues are fully closed around the clock due to extensive road damage. The replacement road is currently being designed, and construction is now estimated to start in summer 2027. Follow the signed detour; use alternate routes. The detour route will use Monaghan Road or Imboden Road between 26th and 56th avenues.
CDOT Road Construction Updates
View weekly construction updates from the Colorado Department of Transportation.
I-70 pavement repairs from Chambers to E-470
The Colorado Department of Transportation and contract partner, Villalobos Concrete, Inc., are repairing and replacing concrete pavement in both directions of Interstate 70 from Chambers Road to the E-470 exchange. The purpose of this state and federally funded project is to improve safety and mobility along a heavily traveled 6.6-mile stretch of the I-70 corridor.
Work includes replacing and grinding concrete pavement panels to provide a safe, smooth driving surface, and repairing and repaving the decks of four bridge structures within the project limits. The project has an anticipated duration of 16 months.
Work will take place Monday to Sunday, with working hours split between daytime and overnight shifts. Schedule adjustments will be made during the winter months.
- Sunday, Nov. 15, to Thursday, Nov. 19 - Eastbound I-70 from Chambers Road (exit 283) to Picadilly Road (exit 288)
A single right-lane closure will be in place overnight Sunday, Nov. 15, on eastbound I-70 from the Chambers Road exit to the Picadilly Road exit.
A single left-lane closure will be in place within the Chambers Road to Picadilly Road limits Monday, Nov. 16, and a single right-lane closure will exist nightly from Monday, Nov. 16, through Thursday, Nov. 19, between the Chambers and Picadilly exits.
Lane closure hours are 10 p.m. to 6 a.m.
Changing conditions and delays can be expected and caution is advised.
For more information, visit CODOT.gov/Projects/I70pavementrepairs.
Northbound I-225 Bottleneck Mitigation Project
CDOT is starting construction in early October on a project to improve traffic flow on northbound I-225 between I-25 and Yosemite Street. The project will add an additional through-lane of travel on northbound I-225 to address congestion from merging traffic off I-25. The final configuration after construction will include four continuous lanes. Additional upgrades will include resurfacing and restriping northbound I-225 and improving the drainage infrastructure in the area.
The construction work will continue into December. Crews will alternate between nighttime and daytime construction throughout the project. General nighttime hours will be from 9:30 p.m. to 5:30 a.m. Sunday night through Thursday night and daytime hours are expected from 7 a.m. to 5 p.m. Monday through Friday.
During daytime hours, motorists can expect shoulder closures on northbound I-225 in the project area, with intermittent nighttime closures of the northbound I-25 and southbound off-ramps to northbound I-225. Detours will be in place during those closures. Additional single- and double-lane closures on northbound I-225 may occur during nighttime hours only.
The project team does not anticipate significant delays due to construction; however, motorists are encouraged to account for an extra 10 minutes of travel time. Slow down, watch for workers and equipment, and leave plenty of room between vehicles. Visit CoTrip.org for real-time lane closure updates and the project webpage for more details on the project.
ARTA I-70 Aerotropolis Parkway Interchange Project
The Aerotropolis Regional Transportation Authority and contract partner, Ames Construction, is constructing the I-70 Aerotropolis Parkway Interchange in Adams County.
Part of ARTA’s planned regional transportation infrastructure improvements across the district, the purpose of the project is to provide much-needed access to developments from Aurora and Adams County, and to improve connectivity to Denver International Airport and the adjacent area served by the Aerotropolis Regional Transportation Authority.
Visit the ARTA website for schedule and working hours and ongoing traffic impacts. For questions, call the project hotline at 720.388.2660 or email [email protected].
E-470 Road Widening Updates
View more on this project from the E-470 Tollway Authority.
East Colfax Bus Rapid Transit coming to Aurora
East Colfax BRT Construction is now extending into Aurora, from Yosemite to I-225:
• Construction will be completed in a single phase, with work occurring simultaneously at both eastbound and westbound stations.
• Traffic control cones and lane closures will be used in active construction zones as work progresses.
• Traffic will remain open in the center lanes of East Colfax Ave. throughout the project.
• Work will progress block by block, with each section expected to take about 3 to 6 months to complete.
• Construction work for the side-running stations will occur within designated work zones that include portions of the sidewalk.
Shelter installation schedule:
• In progress: Yosemite (eastbound), Chester (eastbound and westbound), Moline (westbound) and Peoria (eastbound and westbound)
• November/December: R Line (eastbound and westbound), Dayton (eastbound and westbound) and Florence (eastbound and westbound)
• January/February: Kingston (eastbound and westbound), Moline (eastbound), Scranton (eastbound and westbound), Children's Way (eastbound and westbound), Wheeling (eastbound) and Fitzsimons (westbound)
The BRT project continues the work started in Denver to replace the existing 15 and 15L buses and save bus riders up to 30 minutes in travel time from Union Station to the R Line Station at I-225.
Watch the Colfax BRT series, Col-FAQS: On the Street.
More information—including a small business toolkit with resources for how to thrive during construction—is available at DenverGov.org/ColfaxBRT. Business owners also may take a self-assessment to consider how your business might be impacted by construction and what you may need to do to prepare. Additional resources are available from the Aurora-South Metro Small Business Development Center (SBDC) at AuroraGov.org/SBDC.